Home build update: Pre-foundation

Now that the weather is cooperating things are moving at a good clip. We went from a ring of dirt to a fairly substantial packed gravel slab in less than a week. We’re waiting on tests coming back to ensure the gravel is packed tight enough, but the guy taking the samples seemed to be confident it’s ok. According to Wayne from East-West Concrete we should have forms in place next week and hopefully the foundation poured shortly after.

The floor is going to be about 2′ 7″ above ground level due to flood concerns which is why it’s built up so high. That puts our roof 19 feet above ground level.

Septic is finally in the home stretch, we’re taking delivery of 60 tons of fill dirt tomorrow to cover up the leech lines then we’ll be fully operational (after inspection).